Our Capabilities
Recent Project Examples
Goulburn Mulwaree Council, Goulburn, NSW
Three simultaneous projects including; Rossi Wer Water Pump Station Upgrade, Bradley Street Sewerage Pumping Station Upgrade and Goulburn Water Treatment Plant Automation electrical upgrade.
The Project Scope Was: To deliver a complete civil, mechanical and electrical upgrade for the Rossi Weir Pumping Station in Goulburn.
The scope of works included the a new power connection to convert the supply to the pumping station to 415VAC from the original HV design, design and manufacture and installation of a new outdoor kiosk style switchboard, replacement of the HV starters with 3 new ABB AFE LV Starters, supply and installation of a new transformer including infrastructure, supply and installation of 3 new pumps with
415VAC motors, upgrade of site ventilation, design manufacture and installation of a new PLC control panel and software, new local HMI, remote communications via 3/4G modem to the water treatment plant SCADA system, staged live cutover from the previous HV system to the new LV system.
To deliver a complete civil, mechanical and electrical upgrade for the Bradley Street Sewerage Pumping Station in Goulburn.
The scope of works included the refurbishment of the 2 wet wells, new power connection, new switchboard including new pump starters new pumps, new permanent generator, new valving and piping.
To deliver a complete electrical and SCADA upgrade for the Water Treatment plant in Goulburn.
The scope of works included the engineering, manufacture, programming, installation and commissioning of a new PLC based Automation System, and a new fibre optic communications infrastructure to control and monitor the treatment plant.
The project scope included the design, manufacture, installation and commissioning of a new Main Switchboard as well as new distributed control panels.
Our certifications include:
The objective of our systems engineering business is to provide productivity enhancement solutions.
Our key markets where we have particular expertise are, Water and Wastewater, Rail and Manufacturing. We are able to deliver productivity enhancement through the know-how and knowledge of our people and understanding of our clients and their needs.
Our engineers are experienced, trained and proficient in many of the most widely used products and technologies developed for use in the industrial applications space.
Itech Corporation maintains strong working relationships with the leading manufacturers of Industrial Automation equipment, including: Rockwell, Siemens, Mitsubishi Electric, Schneider Electric, Omron and GE.
To contact Itech Corporation about Water and Sewerage Systems Upgrades use Get a quote.
Our Capabilities
Recent Project Examples
Goulburn Mulwaree Council, Goulburn, NSW
Three simultaneous projects including; Rossi Wer Water Pump Station Upgrade, Bradley Street Sewerage Pumping Station Upgrade and Goulburn Water Treatment Plant Automation electrical upgrade.
The Project Scope Was: To deliver a complete civil, mechanical and electrical upgrade for the Rossi Weir Pumping Station in Goulburn.
The scope of works included the a new power connection to convert the supply to the pumping station to 415VAC from the original HV design, design and manufacture and installation of a new outdoor kiosk style switchboard, replacement of the HV starters with 3 new ABB AFE LV Starters, supply and installation of a new transformer including infrastructure, supply and installation of 3 new pumps with
415VAC motors, upgrade of site ventilation, design manufacture and installation of a new PLC control panel and software, new local HMI, remote communications via 3/4G modem to the water treatment plant SCADA system, staged live cutover from the previous HV system to the new LV system.
To deliver a complete civil, mechanical and electrical upgrade for the Bradley Street Sewerage Pumping Station in Goulburn.
The scope of works included the refurbishment of the 2 wet wells, new power connection, new switchboard including new pump starters new pumps, new permanent generator, new valving and piping.
To deliver a complete electrical and SCADA upgrade for the Water Treatment plant in Goulburn.
The scope of works included the engineering, manufacture, programming, installation and commissioning of a new PLC based Automation System, and a new fibre optic communications infrastructure to control and monitor the treatment plant.
The project scope included the design, manufacture, installation and commissioning of a new Main Switchboard as well as new distributed control panels.
Our certifications include:
The objective of our systems engineering business is to provide productivity enhancement solutions.
Our key markets where we have particular expertise are, Water and Wastewater, Rail and Manufacturing. We are able to deliver productivity enhancement through the know-how and knowledge of our people and understanding of our clients and their needs.
Our engineers are experienced, trained and proficient in many of the most widely used products and technologies developed for use in the industrial applications space.
Itech Corporation maintains strong working relationships with the leading manufacturers of Industrial Automation equipment, including: Rockwell, Siemens, Mitsubishi Electric, Schneider Electric, Omron and GE.
To contact Itech Corporation about Water and Sewerage Systems Upgrades use Get a quote.